July was filled with dramatic changes in our kitchen project. Sub-contractors were in to do the plumbing, electrical, mechanical, sheetrocking. Inspectors stopped by with approvals. Ladders and paintbrushes became a part of my daily life. Cabinetry was hung/installed, measurements taken and granite countertops installed. Flooring was ordered, and in between all of that we took a week off camping at Wallowa Lake.
For Father's Day the boys gave Dad a gift of time and manpower. They took up the sub-floor in the dining room, hung sheetrock, and demo'd the main bathroom. What an amazing gift! The two of us could never have moved this project so far ahead without their help.
Here's a photo recap of the progress made during the month of July: